The Mount, Stoke

Solid Wall Property, Adjoining Bungalow Annexe

The Mount, Stoke, is an impressive, old solid wall property with adjoining bungalow annexe. Both were fed separately from oil boilers, so we worked closely with Windhager and installed a Biowin 45kW boiler utilising the existing chimney flue. A seven tonne pellet store was installed in the basement which was adapted to ground level.


Key Facts

Domestic Biomass

Existing Fuel: Oil
Annual Fuel Bill: £4,692

Biomass

System: Windhager BioWin 45kW
Install Cost: £37,145
Annual Fuel Saving: £1,496
Annual RHI Income: £8,296
Total Fuel and RHI Gain: £31,399

13 + 8 =

South East Office

Just Energy Solutions Limited

North Orbital Road

St Albans

Hertfordshire AL2 1DL

t: 0844 880 8189

e: hello@justenergysolutions.com

North East Office

Just Energy Solutions Limited

Suite 8, SV Rutter Business Centre

126 Great Lime Road

Newcastle NE12 6RU

t: 01912 600 556

e: hello@justenergysolutions.com

South West Office

Just Energy Solutions Limited

Penstraze Business Centre

Truro

Cornwall TR4 8PN

t: 01872 562 118

e: hello@justenergysolutions.com