Mr Simmons, Norwich

Norwich, Suffolk, 3 Bedroom Semi-Detached

Just Energy Solutions worked with Windhager to install their new range Bio Win 2 Biomass boiler. The installation took just 2 days to install and commission which also included the removal of the existing oil boiler.

With our oil bills continuing to rise year on year, we looked at Biomass as a sustainable solution to reducing our fuel cost. The system works the same as any convential oil boiler and it’s been a very easy and cost effective solutions for us. I want to thank Just Energy Solutions for a great service!
Mr Simmons, Suffolk


Key Facts

Domestic Biomass

Existing Fuel: Oil
Annual Fuel Bill: £850

Biomass

System: Windhager Bio Win 2
Install Cost: £9000
Annual Fuel Save: £240
Annual RHI Income: £1700

2 + 12 =

South East Office

Just Energy Solutions Limited

North Orbital Road

St Albans

Hertfordshire AL2 1DL

t: 0844 880 8189

e: hello@justenergysolutions.com

North East Office

Just Energy Solutions Limited

Suite 8, SV Rutter Business Centre

126 Great Lime Road

Newcastle NE12 6RU

t: 01912 600 556

e: hello@justenergysolutions.com

South West Office

Just Energy Solutions Limited

Penstraze Business Centre

Truro

Cornwall TR4 8PN

t: 01872 562 118

e: hello@justenergysolutions.com